Consistent performance and care from IT Leaders

Different sized clients all with unique needs but a common goal: optimise their technology to improve their business bottom line.
Here is a small sample of our client base.

 

IT Leaders creates Australian first: Very High Speed (low cost) Internet for remote areas

 

Linc Energy was not the first Australian company who faced challenges with getting high speed connectivity into a remote area.

Their Gas-To-Liquids plant outside of Chinchilla in Queensland is a world-leading energy technology that can turn coal into diesel and other liquid fuels. But being so far out west, there are very limited options for high speed Internet to link the plant back to their headquarters in Brisbane.

As one project we were working on for Linc Energy, we looked into every available internet option including DSL technologies, frame relay, two-way satellite, 'megalink' and microwave. Frame relay was initially chosen because it was the simplest technology to hook into their existing Telstra private network, but Telstra later advised the exchange at Chinchilla could not handle frame relay. Satellite was attractive for simplicity and scaleable speed but the capital and running cost was prohibitive.

A more complex, DSL/Microwave link was the next likely candidate, but it was going to cost at least $70,000 initially and also create multiple potential points of failure and multiple vendors to manage.

So IT Leaders' engineers then looked into the possibility of using multiple wireless connections. We knew that the wireless signal strength in the area was good but a single connection did not have enough bandwidth for the client. Some research indicated that that what we wanted to do had never been done in Australia before.

We imported some specialist technology and joined three wireless connections together, with a series of high gain, strategically located antennas and a load balancing multiplexing router.

The solution worked perfectly. For around half the monthly fee or less of any other suitable solution, and a small amount of setup cost, Linc Energy now has highly effective, partially redundant, high Internet bandwidth at their remote facility. Combined speed is a consistent 5.8Mbps download and 1.8Mbps upload. That is three times the speed of Frame Relay, at half the cost, and closer to one tenth the monthly fees of a two-way satellite link with that downlink speed.

We can duplicate this configuration almost anywhere in Australia, for the benefit of Linc Energy's expansion plans, and for any of our other clients or enterprises that require it. We can also add other levels of redundancy into the solution, for example adding a low bandwidth copper based connection (such as DSL, ISDN, one-way satellite or low end frame relay - whatever is available) and have automatic failover. This allows essential internet based services to continue to run in the event of a major wireless outage.

Adopting this innovative solution is just another example of how Linc Energy is a pioneer of new and creative technologies.

Please contact IT Leaders of 07 5597 5355 to discuss high speed Internet for your remote site.


 
 

Largest Recycled Water Project in Australian History is supported by IT Leaders

 

The Western Corridor Recycled Water Pipeline is Australia's largest recycled water project. It's purpose is to transport recycled water to power stations and other required areas in QLD and conserve more than 200,000,000 litres per day of potable dam water for other purposes.

The Eastern Pipeline Alliance (EPA) is an alliance between GHD, Lucas and Transfield which was awarded the Eastern portion of this government project. This portion of the project comprised building over 100 kilometers of underground pipeline, traversing 50 waterway and road crossings (including the Brisbane river), and the building of ten pumping stations.

Lucas selected IT Leaders to assist with EPA operations in Queensland. IT Leaders supplied project staff to augment Lucas staff in the early stages of the project, providing both support and project execution assistance.

In the final stages of the project IT Leaders assumed full responsibility and hosting for all EPA server assets, and performed a physical-to-virtual migration of servers to then enable and organise disposal of IT assets. The migration was done into our cutting edge Private Cloud server farm, to enable complete server-independent failover, and maximum levels of redundancy, without requiring the further purchase of any assets.

We received excellent feedback from both Lucas and EPA consultants Evans Peck during and after the project, on our ability to maintain service levels during their fluctuating requirements.


 

National Security Group needed ultimate reliability and value

 

National Security Group is a respected and successful QLD-based security firm.

With their rapid growth they realised that looking after their own IT needs was becoming a distraction and holding up aspects of their business.

In a well planned and executed move, National Security outsourced its IT management requirements to IT Leaders via a Drive [Perfomance] Plan, including 24x7 response for critical server infrastructure.

National Security Group achieved higher reliability of systems and the peace of mind of a rigorously followed Service Level Agreement with 24 x 7 support. NSG is also taking advantage of IT Leaders highly skilled project engineers to deliver advancements and fortifications to their IT systems and plan IT systems highly intelligently, and in advance of impending business needs.

View Page

| 1 2 3 | Next >